Air starting system for FWP

Hatraco designed and supplied 2 Air start systems which are applied as primairy starting system for Caterpiller C18 diesel engine driven fire water pump sets. (FWP)

These FWP sets are deployed in the North Field East project from Qatar Energy, in a joint venture with the Japanese company Chiyoda and Technip Energy. This project and is the world’s largest Liquefied Natural Gas (LNG) project to date. (2022)


 

TECHNICAL INFORMATION
Project:North Field East
End user:Qatar energy
Location:Qatar
EPCC:Technip / Chiyoda
Start capacity:1x 1500 Litres
Start requirements :6 times 30 seconds each
Recharge time:within 60 minutes from 6,5-30 bar
Engine:Caterpiller C18
Required engine firing speed  :120 RPM
Application:Primairy starting system for diesel engine driven FWP sets
Design code / Certification   :ASME VIII Div 1, U-stamped horizontally 1500Liter air receiver
Specialties:Control panel for stand alone operation