Hatraco designed and supplied 2 Air start systems which are applied as primairy starting system for Caterpiller® C18 diesel engine driven fire water pump sets. (FWP)
These FWP sets are deployed in the North Field East project from Qatar Energy, in a joint venture with the Japanese company Chiyoda and Technip Energy. This project and is the world’s largest Liquefied Natural Gas (LNG) project to date. (2022)
TECHNICAL INFORMATION
Project | : | North Field East |
End user | : | Qatar energy |
Location | : | Qatar |
EPCC | : | Technip / Chiyoda |
Start capacity | : | 1x 1500 Litres |
Start requirements | : | 6 times 30 seconds each |
Recharge time | : | within 60 minutes from 6,5-30 bar |
Engine | : | Caterpiller C18 |
Required engine firing speed | : | 120 RPM |
Application | : | Primairy starting system for diesel engine driven FWP sets |
Design code / Certification | : | ASME VIII Div 1, U-stamped horizontally 1500Liter air receiver |
Specialties | : | Control panel for stand alone operation |